Meet The Facilities Series
Over the next few months, we will be releasing an inside look at several of our primary facilities at Arcwood Environmental™ Services. These blogs will expand on plant capabilities and infrastructure, while also demonstrating the primary role of each facility within our TSDF network. Additionally, each blog will showcase how our facilities prioritize safety and compliance and share insight from facility leadership. Today, we’re pleased to spotlight Rineco, our fuel blending facility located in Benton, Arkansas.
Plant Capabilities and Infrastructure
Rineco, a Arcwood Environmental™ Services facility, operates one of the largest fuel blending facilities in North America. We have achieved this through continuous improvement and betting on our employees. Our facility operates 24 hours a day with the ability to process 500,000 pounds per day.
A few of our operational highlights include:
What We Do Best
Through the use of a solid and liquid blending process, Rineco manufactures waste-derived fuel that is used as an alternate fuel source to replace coal and natural gas in cement kilns. This is a safe and effective method of recovering the energy value in waste and helps conserve our planet’s finite natural resources. Nearly 20 cement kilns throughout the U.S. use regulated waste as a supplemental fuel. This is covered under U.S. EPA’s Boiler and Industrial Furnace (BIF) regulations. Strict compliance with feed rates, temperatures, and stack testing must be followed in order to use this material as fuel. Since nearly 60% of the cost of manufacturing cement is in the fossil fuels needed to produce temperatures of 3000°F, this is a very important factor in the process.
By reusing industrial wastes in cement kilns, generators are given an environmentally sound option for disposing of their waste, natural resources are conserved, and cement is produced at reduced prices. Troy Cooley, Plant Manager of Rineco, expanded on the value behind this sustainable process: “We have created safe and regulatory compliant methodologies to blend materials into a useful commodity and by doing so, our plant can help to reduce landfill space, help to preserve natural resources, and have a positive contribution to our nation’s economy.”
Safety and Compliance
Rineco facility leadership takes the safety of our employees and visitors very seriously. This safety focused approach begins with the waste profile generation and continues to the final destruction at the kiln. Our emphasis on safety centers around the Heritage core value of Safe and Compliant or Not at All. “Safe and Compliant or Not at All is how we invest in our community, our business, our people, and our future,” Troy explained.
To ensure absolute compliance, Rineco’s internal tracking system leverages the same concept as RCRA’s “cradle to the grave”. When waste materials arrive at our facility, samples are collected and then analyzed at our on-site laboratory where we ensure conformity with the waste profile. Containers are then tracked via an individual bar-code identification label that allows us to track specific containers throughout the blending process, including documenting the final disposal destination of the material.
Some of our safety practices include:
Leadership Insight
Troy Cooley, Plant Manager
“Being a leader means listening to your people and helping them find their way to safe, compliant, and productive success for the individuals, the team, and the company.”
If you are interested in learning more about Rineco’s capabilities, fuel blending, or any additional information please fill out our contact us form.